Quality Assurance At Every Stage
Decades of manufacturing experience have helped us build consistent production processes and inspection standards.
Key components, assembly quality, and machine condition are checked at different production stages before final approval.
Our machines are covered by a 12-month warranty for non-human-caused failures, subject to the agreed order terms.
Materials & Components
Before production begins, key materials, components, and electrical requirements are checked against the confirmed machine specification, ensuring your machine is built with the correct configuration from the start.
Blades & Wear Parts
Blade and wear-part materials are selected according to the machine model and application, including SKD-11, DC53, H13, Cr12MoV, 55SiCr, or 60Si2CrV.
Screens & Separation Components
Stainless-steel screens and other separation components are checked for the correct model, size, and intended application before assembly.
Drive & Hydraulic Components
Motors, gearboxes, hydraulic pumps, valves, cylinders, and related components are verified against the machine configuration before installation.
Structure & Electrical Specification
Structural parts, selected electrical components, and the required voltage are checked against your confirmed order to ensure they match your real needs.
Machining & Fabrication
During manufacturing, key fabrication and machining steps are checked throughout production so potential issues can be identified and corrected before final assembly.
Precision Machining
✓ Parts are checked against production drawings
✓ Critical dimensions are verified before assembly
✓ Machined edges, holes, and mounting positions are inspected before the next production stage
Welding & Structure
✓ Frame alignment is checked during fabrication
✓ Welded joints are inspected before surface finishing
✓ Reinforcement areas are confirmed according to the approved design
Wear-Part Fit
✓ Machined contact surfaces are inspected for fit
✓ Wear parts are matched to the intended application
✓ Mounting positions and installation conditions are checked before fastening
Assembly & Electrical Verification
Assembly work in the BSGH Granulator workshop
Mechanical Assembly
✓ Fasteners, guards, and covers checked
✓ Shafts, rotating parts, and transmission alignment reviewed
✓ Lubrication points and moving components checked
✓ Installed components checked for secure assembly
Electrical Verification
✓ Required voltage and frequency confirmed
✓ Control cabinet wiring, terminals, and electrical connections inspected
✓ Emergency stop and relevant safety functions checked
✓ Motor rotation direction confirmed during the initial test run
Confirming Your Order Configuration
Pre-Shipment Testing
After assembly, your machine undergoes a functional test to confirm stable operation and correct response before shipment.
No-Load Running
Run your machine without material to check for abnormal noise, vibration, or unstable operation.
Operating Direction
Confirm motors and moving components operate in the correct direction and sequence.
Safety Response
Verify the emergency stop, safety switches, and other fitted protection functions respond correctly.
Material Processing Test
We use real material sample to verify your machine’s main working function under actual operating conditions.
Final Inspection & Packing
Before packing, your machine receives a final release check to confirm that the ordered configuration, included accessories, required documents, and overall machine condition are ready for shipment.
MS-D2000 Shredder Packing in 40“ Flat-rack
Depending on your equipment and shipping requirements, we may use a wooden case, standard container, open-top container, or flat-rack container.
Konfiguration
Machine model and major configuration are checked against the confirmed order.
Accessories
Included tools, accessories, spare parts, and other loose items are counted and confirmed.
Documents
Available manuals, packing lists, and other agreed documents are prepared for shipment.
Maschinenzustand
Your machine is visually checked after testing to confirm accessible parts and external surfaces are in proper condition.
Shipping Protection
Appropriate wrapping, fixing, and moisture protection are arranged according to your machine and transport method.
Final Release
Packing begins only after the final inspection is completed and your machine is confirmed ready for shipment.
Machine Tests & Factory Videos
CE-Zertifizierung
Questions Before Shipment
Clear information before testing helps us verify the points that matter most for your machine and material.
Do You Test Every Machine Before Shipment?
Yes. Completed machines are test-run before shipment to verify basic operation and the functions applicable to each model.
Can I Receive A Test Video Before Delivery?
Yes. We can provide a pre-shipment test video so you can review the machine operation and key functions before delivery.
Can You Test The Machine With My Own Material?
In many cases, yes. It depends on your material type, whether the sample can be shipped to our factory. Please confirm the material test with our team in advance.
How Do You Confirm The Correct Voltage And Frequency?
The voltage and frequency confirmed in your order are checked during electrical configuration and again before the machine completes its test stage.
Can I Specify What I Want Checked Before Shipment?
Yes. If you have specific concerns about material processing, machine functions, electrical configuration, or other operating points, let us know before testing so they can be included in the pre-shipment review.
What Happens If An Issue Is Found During Testing?
What Would You Like Us To Verify?
Send your material photos, target capacity, country and electrical requirements. We will help you identify a suitable setup and the checks to confirm before shipment.
Material photos · Capacity · Country · Voltage